I-25 South Gap Project

Published:
Thursday, August 20, 2020
<< Back to News

08/20/20  

TOWN RESIDENTS: Be aware of the I-25 detour of traffic!

I-25 and County Line Road Traffic Impacts: Aug. 21 and Aug. 22 - County Line Road over I-25 also will be closed each night. Local traffic should access I-25 at Colorado Highway 105 from either Monument Hill Frontage Road (east of I-25) or Beacon Lite Road (west of I-25).  During this closure, crews will remove asphalt, install three major drainage crossings up to a 15-foot depth, and then replace the asphalt, which needs time to set. Motorists can expect to see crews setting cones as early as 5 p.m. both nights. 

Details and maps are contained in the PDF below.